The existing GMWC wastewater treatment facility was constructed in phases with the initial operation being commissioned in 1994. The current facility is a chemically enhanced primary treatment plant with an average day capacity of 115,000 m3/d. A site plan depicting the existing plant is provided in figure 2.1 below. 

 