Wastewater treatment

The tunnel under the Petitcodiac River extending from Moncton to the WWTF in Riverview was inspected using an innovative approach with a model boat equipped with a GoPro camera and LED Lights was completed showing there were no major deficiencies or infiltration.  The tunnel was insured in 2016 for $12M.

 

 

© GMWC, 2014. All rights reserved.