01/16/2020 |
2020 M&E Supervision |
$640,000 |
Black and McDonald Limited |
02/20/2020 |
Phase 3B Doors and Windows |
$90,250 |
Royal Doors |
02/20/2020 |
Phase 3A N&S Access Gallery Masonry |
$68,383.35 |
Acadia Bricklayers |
02/20/2020 |
Phase 3A & 4 Waterproofing and Cracksealing |
$160,000 |
Alternative Concrete Technologies Ltd. |
02/20/2020 |
Phase 4 Sludge Mixing Equipment |
$314,176 |
John Brooks and Company Limited |
03/19/2020 |
Phase 4B Design and Construction Management |
$530,000 |
CBCL Limited |
03/19/2020 |
Phase 4C Design and Construction Management |
$116,500 |
CBCL Limited |
04/16/2020 |
Environmental Insurance Policy |
$227,487 |
Zurich |
05/21/2020 |
Phase 4 (Dewatering Bldg.) Roofing |
$137,120 |
Flynn Canada |
05/21/2020 |
Fox Creek to Babineau Creek Trunk Sewer Forcemain - Phase 1 - Dieppe |
$858,198 |
Birch Hill Construction |
06/18/2020 |
Phase 5 Splitter Box |
$323,500 |
Lancor Concrete Contractors Ltd., Osco Concrete NB Ltd., Harris Rebar and Modern Construction Ltd. |
06/25/2020 |
Phase 3A Handrails |
$338,334 |
Sparks Fabrication & Machining |
07/16/2020 |
GMWC Banking Services |
-- |
Bank of Montreal |
07/16/2020 |
Security Camera System Upgrade |
$39,474 |
Atlantic Data Supplies (N.B.) Ltd. |
08/20/2020 |
4B Biosolids Conveyor System |
$580,186.00 |
B.I.D. Canada |
08/20/2020 |
Phase 5 Roof Structure |
$54,750.00 |
Canam Group Inc. |
08/20/2020 |
Phase 3A Influent Channel Grating |
$57,928.99 |
Sparks Fabrication & Machining |
08/27/2020 |
Final Site Works |
$2,450,000.00 |
Modern Construction Ltd. |
08/27/2020 |
Fox Creek WWPS Building Construction |
$1,475,225.00 |
Camille Leger Ltd. |
08/27/2020 |
Phase 4B Excavation |
$52,500.00 |
Modern Construction Ltd. |
09/17/2020 |
Main Pumping Station Variable Frequency Drive Repair |
$31,760.00 |
Litetec |
09/17/2020 |
Fox Creek WWPS Building Construction Contract Management |
$99,800.00 |
Crandall Engineering |
09/24/2020 |
Phase 4B Building Structure and Roofing |
$372,971.00 |
Black and McDonald and Flynn Canada Ltd. |
09/24/2020 |
Phase 4B Masonry |
$486,099.34 |
Acadia Bricklayers |
10/15/2020 |
Phase 4 Generator Installation |
$191,084 |
Black and McDonald |